Investment Decision Notifications

Element 25 Limited

Butcherbird Manganese Project

Investment Decision Date: May 2025

Name of project proponent Element 25 Limited
Nature of investment/project

Construction of an expanded processing facility at the existing Butcherbird site, increasing manganese concentrate production capacity from 360Ktpa to 1.1Mtpa. 

Location Pilbara region, 130 kilometres south of Newman, WA.
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $50m

Forecast Public Benefit

$909.1m in Gross Regional Product (GRP) to the Pilbara region, 149 jobs during construction and 229 jobs during operations over 18 years.

Indigenous Engagement Strategy

Please refer to the project page by clicking on the link below this table.

Learn more about the Butcherbird Manganese Project

Community Housing Limited (CHL) in collaboration with Tetris Capital Pty Ltd (Tetris)

Cairns Seniors Community Housing Project

Investment Decision Date: August 2024

Name of project proponent Community Housing Limited (CHL) in collaboration with Tetris Capital Pty Ltd (Tetris)
Nature of investment/project

For the purposes of providing social, affordable and specialist disability accommodation (SDA). 

Location Cairns, Queensland
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $140m

Forecast Public Benefit

$140.8m (during construction and over 20 years operational lifetime) and 322 jobs (290 during construction and 32 during operations)

Indigenous Engagement Strategy

Please refer to the project page by clicking on the link below this table.

Learn more about the Cairns Seniors Community Housing Project

North Queensland Airports

Airports Upgrade Project

Investment Decision Date: April 2024

Name of project proponent North Queensland Airports
Nature of investment/project

For the purposes of delivering an upgrade capex program at the Cairns and Mackay Airports (Project).

Location Cairns and Mackay, Queensland
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $155m

Forecast Public Benefit

$1.4b (during construction and 20-year operational lifetime) and 2,002 jobs (505 during construction and 1,497 during operations)

Indigenous Engagement Strategy

Please refer to the project page by clicking on the link below this table.

Learn more about the North Queensland Airports Upgrade Project

Alpha HPA Limited

HPA First Project

Investment Decision Date: January 2024

Name of project proponent Alpha HPA Limited
Nature of investment/project

The Alpha HPA First Project involves the development of a full-scale commercial plant and associated site infrastructure which will produce high-purity alumina (HPA) and related high-purity aluminum products.

Location Gladstone, Queensland
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $200m

Forecast Public Benefit

$437.4m (during construction and 20-year operational lifetime) and 693 jobs (489 during construction and 204 during operations).

Indigenous Engagement Strategy

Please refer to the project page by clicking on the link below this table.

Learn more about the Alpha HPA First Project

Arafura Rare Earths Ltd

Nolans Bore Rare Earths Project

Investment Decision Date: January 2024

Name of project proponent Arafura Rare Earths Limited
Nature of investment/project

The Nolans Rare Earths Project comprises the development of a rare earths mine and processing facilities (including beneficiation, extraction, and separation plants).

Location 135km north of Alice Springs, Northern Territory
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $200m

Forecast Public Benefit

$1.4b (during construction and 29.25-year operational lifetime) and 334 jobs (during construction and operations).

Indigenous Engagement Strategy

Please refer to the project page by clicking on the link below this table.

Learn more about the Nolans Bore Rare Earths Project

Heritage Minerals

Mount Morgan Tailings Processing and Rehabilitation Project

Investment Decision Date: December 2022

Name of project proponent Heritage Minerals
Nature of investment/project

Mount Morgan Gold Mine

Location Mount Morgan, Queensland
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $66m

Forecast Public Benefit

$849m (during construction and over 6-year operational lifetime) and 400 jobs (250 during construction and 150 during operations).

Learn more about the Mount Morgan Tailings Processing and Rehabilitation Project

Pilbara Minerals Ltd

P680 Expansion Project

Investment Decision Date: September 2022

On 20 September 2022, the NAIF Board made an Investment Decision to offer a Financing Mechanism, being a loan of up to $125 million, to Pilbara Minerals Limited in Western Australia for the purpose of supporting the expansion of operations at its Pilgangoora Operations.

Name of project proponent Pilbara Minerals Limited
Nature of investment/project

P680 Expansion Project

Location Pilbara region, Western Australia
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $125m

Forecast Public Benefit

$1.4b (during construction and over 18-year operational lifetime) and 675 jobs (355 during construction and 320 during operations).

Learn more about the Pilbara Minerals P680 Expansion Project

Perdaman Chemical and Fertilisers Pty Ltd

Urea Project

Investment Decision Date: August 2022

Name of project proponent Perdaman Chemical and Fertilisers Pty Ltd (PCF)
Nature of investment/project

Development of the Perdaman Urea Plant

Location Burrup Peninsula, north of Karratha, Western Australia
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $220m

Forecast Public Benefit

$8.5b (during construction and over 40 years operation lifetime) and 2,490 jobs (during construction and operations).
Public benefit amount is calculated collectively with the Pilbara Ports Authority Port of Dampier Cargo Wharf Project and Water Corporation Burrup Scheme Upgrade Project.

Learn more about the Perdaman Urea Plant Project

Kimberley Mineral Sands Pty Ltd

Thunderbird Minerals Sands Project

Investment Decision Date: March 2022

Name of project proponent Kimberley Mineral Sands Pty Ltd
Nature of investment/project

Infrastructure related to the development of the Thunderbird Mineral Sands Project which comprises a mine, process plant and non-process infrastructure.

Location The Dampier Peninsula, Kimberley region northern WA, between Derby and Broome
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $160m

Forecast Public Benefit

$1.85b (during construction and over 40-years operational lifetime) and 570 jobs (225 during construction and 345 during operations).

Learn more about the KMS Thunderbird Minerals Sands Project

Water Corporation

Burrup Scheme Upgrade

Investment Decision Date: November 2021

Name of project proponent Water Corporation
Nature of investment/project

Development of critical infrastructure to support the Perdaman Urea Plant including the expansion of the Burrup seawater supply and brine disposal scheme.

Location Pilbara region, Western Australia
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $95m 

Forecast Public Benefit

$8.5b (during construction and over 40 years operation lifetime) and 2,490 jobs (during construction and operations).
Public benefit amount is calculated collectively with the Perdaman Urea Plant and Pilbara Ports Authority Port of Dampier Cargo Wharf Project.

Learn more about the Burrup Scheme Upgrade

Pilbara Ports Authority

Expansion of Port Dampier

Investment Decision Date: November 2021

Name of project proponent Pilbara Ports Authority
Nature of investment/project

Development of critical infrastructure to support the Perdaman Urea Plant including a new multi-user bulk export wharf, including berth and landside at the existing Port of Dampier.

Location Pilbara region, Western Australia
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $160m 

Forecast Public Benefit

$8.5b (during construction and over 40 years operation lifetime) and 2,490 jobs (during construction and operations).
Public benefit amount is calculated collectively with the Perdaman Urea Plant and Water Corporation Burrup Seawater Brine Disposal Scheme.

Learn more about the Expansion of Port Dampier Project

Northern Territory Government

Northern Territory Local Jobs Fund

Investment Decision Date: September 2021

Name of project proponent Northern Territory Government
Nature of investment/project

The project is a proposed financing partnership with the Northern Territory Local Jobs Fund to deliver a growth capex concessional lending program in the Northern Territory. Eligible projects will be across multiple business sectors.

Location Northern Territory
Type of Financing Mechanism

Unsecured limited recourse loan to Northern Territory Local Jobs Fund (through Northern Territory Treasury Corporation) for the purposes of onlending of secured loans.

Amount of Financing Mechanism

Up to $50m 

Forecast Public Benefit

$110.1m and 532 jobs (during construction and operations).

Learn more about the Territory Infrastructure Loans program

ALLIANCE AVIATION SERVICES LTD

Maintenance, Repair and Overhaul (MRO) Facility

Investment Decision Date: August 2021

Name of project proponent Alliance Aviation Services Ltd
Nature of investment/project

The project will enable Alliance to relocate the heavy base maintenance of its entire aircraft fleet, which since 2015 have been serviced predominantly overseas.  The benefits of the Project to Alliance include cost control and operational certainty around its long-term aircraft maintenance plans for its expanding fleet.

Location Rockhampton, Queensland
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $30m 

Forecast Public Benefit

$342m (during construction and over 30 years operational lifetime) and 198 jobs (100 during construction and 98 during operations).

Learn more about the Alliance Airlines Maintenance, Repair and Overhaul (MRO) Facility

Kimberley Cotton Company Ltd

Kimberley Cotton Gin

Investment Decision Date: August 2021

Name of project proponent Kimberley Cotton Company Ltd
Nature of investment/project

The Kimberley Cotton Gin Facility will comprise a two-stand gin module and ancillary infrastructure.

Location Kununurra, Western Australia
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $32m

Forecast Public Benefit

$248m (during construction and over 30 years operational lifetime) and 61 jobs (30 during construction and 31 during operations).

Learn more about the Kimberley Cotton Gin Project

Pembroke Resources Pty Ltd

Olive Downs Steelmaking Coal Project

Investment Decision Date: April 2021

Name of project proponent Pembroke Resources Pty Ltd
Nature of investment/project

Construction of road, water infrastructure, rail, power supply infrastructure and coal handling preparation plant.

Location Bowen Basin, Queensland
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $175m 

Learn more about the Olive Downs Steelmaking Coal Project

BCI MINERALS LTD

Mardie Salt and Sulphate of Potash Project

Investment Decision Date: December 2020

Financial assistance to the project is subject to a number of conditions including the finalisation of the Western Australian Government’s consideration and agreement for the approved funds to be advanced.

Name of project proponent BCI Minerals Ltd
Nature of investment/project

The development of salt and sulphate of potash production facilities, and a port facility.

Location Pilbara region, north-west of WA
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $450m

On 28 September 2021 the NAIF Board made an Investment Decision to offer an additional Financing Mechanism of $40 million to support the project.
For the purpose of Section 17(2) of the Investment Mandate details of that additional decision are as set out above for the original BCI Minerals decision, except as follows:

Up to $40m

Learn more about the BCI Minerals Mardie Salt Project

Humpty Doo Barramundi Pty Ltd

Farm Expansion Project Stage 2

Investment Decision Date: September 2020

Name of project proponent Humpty Doo Barramundi Pty Ltd
Nature of investment/project

Infrastructure associated with second stage of expansion.

Location Humpty Doo, Northern Territory
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $24.2m 

Learn more about the Humpty Doo Barramundi Farm Expansion Project

CQUniversity Australia

Digital Transformation and Supporting Infrastructure

Investment Decision Date: July 2020

Name of project proponent CQUniversity Australia
Nature of investment/project

Package of capital expenditure programs including digital infrastructure.

Location CQUniversity campuses in Queensland
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $76m 

Learn more about the CQU Digital Transformation and Supporting Infrastructure Project

Merricks Capital Pty Ltd

Hudson Creek Power Station and Batchelor Solar Farm

Investment Decision Date: July 2020

Name of project proponent Merricks Capital Pty Ltd
Nature of investment/project

Construction of a 12MW capacity gas power plant and a 10MW capacity solar farm.

Location Darwin and Darwin region, Northern Territory
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $37m 

Learn more about the Hudson Creek Power Station and Batchelor Solar Farm Project

STRANDLINE RESOURCES LTD

Coburn Heavy Mineral Sands Project

Investment Decision Date: June 2020

Name of project proponent Strandline Resources Limited
Nature of investment/project

Development of the Project to allow for mining operations, beneficiation, minerals separation processing and associated infrastructure to produce 23.4Mtpa of mineral sand products.

Location Gascoyne region of WA
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $150 million 

Learn more about the Strandline Resources Coburn Heavy Mineral Sands Project

Charles Darwin University

Education and Community Precinct (Danala) and Casuarina Campus Project

Investment Decision Date: June 2020

Name of project proponent Charles Darwin University
Nature of investment/project

Construction of a new Education and Community precinct in Darwin city (“CDU City Campus”) and the repurposing of the existing campus at Casuarina.

Location Darwin, Northern Territory
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $151.5m 

Learn more about the Education and Community Precinct Project

Mater Health Services North Queensland Limited

Multi-Storey Carpark

Investment Decision Date: March 2020

Name of project proponent Mater Health Services North Queensland Limited
Nature of investment/project

Construction of a six-level car park facility at the Mater Hospital, Pimlico Campus in Townsville. This car park is a critical part of the hospital’s three stage redevelopment.

Location Townsville, Queensland
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $19.75m 

Learn more about the Mater Health Multi-Storey Carpark Project

James Cook University

Student Halls of Residence (Burralga Yumba)

Investment Decision Date: January 2020

Name of project proponent James Cook University
Nature of investment/project

Construction of a new student accommodation facility.

Location James Cook University Townsville Campus, Townsville, Queensland
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $46m 

Learn more about the JCU Student Halls of Residence (Burralga Yumba) Project

Northern Territory Government

Darwin Shiplift Project

Investment Decision Date: November 2019

Name of project proponent Northern Territory Government
Nature of investment/project

Construction of an open access multi-user ship lift facility and associated marine industry infrastructure.

Location East Arm Precinct, Darwin NT
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $300m 

Learn more about the Darwin Shiplift Project

Cowboys Rugby League Football Ltd

Community, Training and High-Performance Centre

Investment Decision Date: November 2019

Name of project proponent Cowboys Rugby League Football Ltd
Nature of investment/project

Construction of multi-user social infrastructure comprising multi-sport high-performance training spaces, sports medicine and sports science laboratories, community spaces and a full-sized training field, in addition to administrative office space.

Location Townsville, Queensland
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $20m

Learn more about the Cowboys Community, Training and High-Performance Centre

Signature Onfarm Pty Ltd

Beef Processing Facility

Investment Decision Date: August 2019

Name of project proponent Signature Onfarm Pty Ltd
Nature of investment/project

Construction of an on-farm, greenfield specialist service, beef processing facility with onsite accommodation for up to 70 employees and other ancillary amenities including office, amenities, lairage, waste water treatment, dry store building, irrigation system and supporting water, energy, telecommunications, road and IT infrastructure.

Location Clermont, Queensland
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $25m 

Learn more about the Signature Onfarm Beef Processing Facility Project

Genex Power Ltd

Kidston Pumped Storage Hydro Project

Investment Decision Date: July 2019

Name of project proponent Genex Power Ltd
Nature of investment/project

Construction of a 250MW pumped storage hydro project.

Location Kidston, Queensland
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $610m 

Learn more about the Genex Power Kidston Pumped Storage Hydro Project

Alinta Energy Pty Ltd

Chichester Solar / Gas Hybrid Project

Investment Decision Date: February 2019

Name of project proponent Alinta Energy Pty Ltd
Nature of investment/project

Infrastructure including  a 60MW solar PV power station; transmission infrastructure; switchyards; and substations to supply electricity.

Location East Pilbara
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $90m 

Learn more about the Chichester Solar/Gas Hybrid Project

Northern Territory Airports Pty Ltd

NT Airports Infrastructure and Upgrades

Investment Decision Date: January 2019

Name of project proponent Northern Territory Airports Pty Ltd
Nature of investment/project

A range of investments as part of an infrastructure expansion package across airport sites in Darwin, Tennant Creek and Alice Springs including:

  • the construction of a freight and cold storage and an export hub at Darwin International Airport;
  • solar energy farms at Darwin, Tennant Creek and Alice Springs along with an off-site multi-user battery; and
  • upgrades to Alice Springs Airport including the resurfacing of the airport’s runway, taxiways and apron and installation of new runway lighting.
Location Darwin, Alice Springs and Tennant Creek, Northern Territory
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $150m 

Learn more about the Northern Territory Airports Infrastructure and Upgrades Project

Queensland Airports Ltd

Redevelopment of Townsville Airport

Investment Decision Date: January 2019

Name of project proponent Queensland Airports Ltd
Nature of investment/project

Redevelopment and expansion of the Townsville Airport Passenger Terminal including substantial refurbishment of the terminal (such as doubling the capacity of the departure lounge, new boarding gates, expanded security areas and the installation of self-check in and bag-drop facilities), better road access and an upgrade to core infrastructure.

Location Townsville, Queensland
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $50m 

Learn more about the Queensland Airports Redevelopment of Townsville Airport Project

James Cook University

Technology Innovation Complex

Investment Decision Date: June 2018

Name of project proponent James Cook University
Nature of investment/project

Building of a Technology Innovation Complex, a 10,000m2 centre for students, industry partners and researchers.

Location James Cook University Townsville Campus, Townsville, Queensland
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $96m 

Learn more about the JCU Engineering and Innovation Place Project

Voyages Indigenous Tourism Australia Pty Ltd

Connellan Airport Upgrades and Accommodation

Investment Decision Date: May 2018

Name of project proponent Voyages Indigenous Tourism Australia Pty Ltd
Nature of investment/project

Airport runway, taxiway and apron upgrade, runway lighting and provision of contractor accommodation.

Location Yulara, Northern Territory
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $27.5m

Learn more about the Voyages Connellan Airport Upgrades and Accommodation Project

Humpty Doo Barramundi Pty Ltd

Farm Expansion Stage 1

Investment Decision Date: May 2018

Humpty Doo Barramundi Pty Ltd

Name of project proponent Humpty Doo Barramundi Pty Ltd
Nature of investment/project

Development of a solar farm,  a medium fish nursery, processing equipment and adult fish feeding systems.

Location Humpty Doo, Northern Territory
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $7.18m 

Learn more about the Humpty Doo Barramundi Farm Expansion Project

Onslow Marine Support Base Pty Ltd

Onslow Marine Support Base

Investment Decision Date: September 2017

Name of project proponent Onslow Marine Support Base Pty Ltd
Nature of investment/project

Development of a marine supply facility including wharf and harbour expansion.

Location Beadon Creek Onslow, Western Australia
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $16.8m 

Learn more about the Onslow Marine Support Base Project

Investment Decisions no longer proceeding with NAIF loan

De Grey Mining Ltd

Hemi Gold Project

Investment Decision Date: July 2024

Name of project proponent De Grey Mining Ltd
Nature of investment/project

The Hemi Gold Project comprises the development of a conventional open cut gold mine located in the Pilbara region of WA.

Location In the Pilbara ~85km south of Port Hedland, Western Australia
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $150m 

Forecast Public Benefit

$6.2b (during construction and over 12 years operational lifetime) and 1,740 jobs (1,240 jobs over 2 years and 500 jobs during operations).

Indigenous Engagement Strategy

The proponent made commitments in their Indigenous Engagement Strategy in relation to participation, employment and procurement, however this project is no longer proceeding with a NAIF loan.

Mater Private Hospital Townsville

Maternity and Renal Unit Project

Investment Decision Date: September 2023

Name of project proponent Mater Private Hospital Townsville (Mater Misericordiae Ltd).
Nature of investment/project

The Project comprises a single level purpose-built maternity suite and the refurbishment of an existing building to house renal services. It also involves transferring the maternity and renal services from Hyde Park to Pimlico campus, thereby providing modern facilities, and growing renal capacity to meet community demand and local population growth.

Location Pimlico Campus, Mater Private Hospital Townsville, QLD
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $25m 

Forecast Public Benefit

$46.5m (during construction and over 20 years) and 181 jobs (168 jobs during construction and 13 during operations).

Indigenous Engagement Strategy

The proponent made commitments in their Indigenous Engagement Strategy in relation to participation, employment and procurement, however this project is no longer proceeding with a NAIF loan.

Hastings Technology Metals Ltd

Yangibana Rare Earths Project

Investment Decision Date: December 2022

Name of project proponent Hastings Technology Metals Ltd
Nature of investment/project

Development of the Yangibana Rare Earths project which comprises the mine site located the Gascoyne region of Western Australia and a hydrometallurgical plant located in Onslow, Western Australia. The Project will produce up to 15,000 tonnes of mixed rare earths carbonate (“MREC”) product with primary content being neodymium and praseodymium (used for permanent magnets) over 14.25 years’ mine life.

Location Gascoyne Region and Onslow, Western Australia
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $220m 

Forecast Public Benefit

$1.33b (during construction and over 15 years operational lifetime) and 695 jobs (476 jobs during construction and 219 during operations).

Indigenous Engagement Strategy

The proponent made commitments through their Indigenous Engagement Strategy for participation, procurement, training and education. 

Mackay Land Pty Ltd

Gold Tyne Capital Works

Investment Decision Date: December 2021

Name of project proponent Mackay Land Pty Ltd
Nature of investment/project

Gold Tyne Capital Works

Location Lakeland, Queensland
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $44m 

Forecast Public Benefit

$181 (during construction and over 20 years) and 639 jobs (267 jobs during construction and 372 during operations).

Hastings Technology Metals Ltd

Yangibana Rare Earths Project

Investment Decision Date: December 2021

Name of project proponent Hastings Technology Metals Ltd
Nature of investment/project

Development of the Yangibana Rare Earths project which comprises the mine site located the Gascoyne region of Western Australia and a hydrometallurgical plant located in Onslow, Western Australia. The Project will produce up to 15,000 tonnes of mixed rare earths carbonate (“MREC”) product with primary content being neodymium and praseodymium (used for permanent magnets) over 14.25 years’ mine life.

Location Gascoyne Region and Onslow, Western Australia
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $140m 

Forecast Public Benefit

$1.33b (during construction and over 15 years operational lifetime) and 695 jobs (476 jobs during construction and 219 during operations).

Arnhem Land Progress Aboriginal Corporation

Redevelopment of Food Storage and Warehouse Facility

Investment Decision Date: June 2021

Name of project proponent Arnhem Land Progress Aboriginal Corporation
Nature of investment/project

The redevelopment of an existing food storage and warehouse facility owned by ALPA. The redevelopment involves the construction of a state-of-the-art ammonia-based refrigeration facility and enhancements to the existing ambient warehouse.

Location Alice Springs, Northern Territory
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $13.5m 

Australian Potash Ltd

Lake Wells Sulphate of Potash Project

Investment Decision Date: February 2021

Name of project proponent Australian Potash Ltd
Nature of investment/project

The development of the Lake Wells Sulphate of Potash project.

Location Eastern Goldfields region of WA
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $140m

Neoen SAS

Kaban Green Power Hub

Investment Decision Date: December 2020

Name of project proponent Neoen SAS
Nature of investment/project

Kaban Green Power Hub

Location Kaban, Queensland
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $280m 

Agripower Australia Ltd

Silicon Fertiliser Mining Facilities and Processing Facility

Investment Decision Date: December 2020

Name of project proponent Agripower Australia Ltd
Nature of investment/project

The development of silicon fertiliser mining facilities and a processing facility in accordance with an approved capital works program.

Location Conjuboy and Charters Towers, Queensland
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $71m 

BSE Maritime Solutions

Shiplift Facility

Investment Decision Date: October 2020

Name of project proponent BSE Maritime Solutions
Nature of investment/project

Development of a Shiplift Facility

Location Cairns, Queensland
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $32m 

Anthony Veder Group N.V.

LNG Bunkering Project

Investment Decision Date: July 2020

Name of project proponent Anthony Veder Group N.V.
Nature of investment/project

LNG Bunkering Project

Location Western Australia
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $129m

Metro Mining Ltd

Bauxite Hills Mine Stage 2 Expansion Project

Investment Decision Date: November 2019

Name of project proponent Metro Mining Ltd
Nature of investment/project

Construction of an offshore floating terminal, to facilitate the loading of bauxite from barges on to ships for transportation to customers.

Location North of Weipa, Queensland
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $47.5m

Australian Aboriginal Mining Corporation Pty Ltd

Borefield, Crushing Plant and Site Accommodation

Investment Decision Date: August 2019

Name of project proponent Australian Aboriginal Mining Corporation Pty Ltd
Nature of investment/project

Construction of a borefield, crushing plant and site accommodation and a 55km haul road to connect the Great Northern Highway to the Cloudbreak site.

Location 80 kms north west of Newman, Western Australia
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $12.5m 

Kalium Lakes Ltd

Beyondie Sulphate of Potash Project

Investment Decision Date: February 2019

Name of project proponent Kalium Lakes Ltd
Nature of investment/project

Development of the Beyondie Sulphate of Potash Project involving sulphate of potash (SOP), with initial production of 90ktpa SOP plus supporting infrastructure comprising a 78 kilometre gas pipeline, a gas-fired power station, access road, communication facilities, an airstrip and an accommodation village.

Location Southeast of Newman, within the Shires of Wiluna and Meekatharra of Western Australia.
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $74m 

On 26 August 2021 the NAIF Board made an Investment Decision to offer an additional Financing Mechanism of $10 million to support the Beyondie Sulphate of Potash Project.
For the purpose of Section 17(2) of the Investment Mandate details of that additional decision are as set out above for the original Kalium Lakes decision, except as follows:

Up to $10m

Sheffield Resources Ltd

Thunderbird Minerals Sands Project

Investment Decision Date: August 2018

Name of project proponent Sheffield Resources Ltd
Nature of investment/project

Construction of infrastructure including LNG power station and reticulation, site accommodation village and processing facility and also upgrading of existing local road and port infrastructure all to support the Thunderbird Mineral Sands Project.

Location West Kimberley, between Derby and Broome, Western Australia
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $95m 

Pilbara Minerals Ltd

Pippingarra Road Upgrade

Investment Decision Date: August 2018

Name of project proponent Pilbara Minerals Ltd
Nature of investment/project

Upgrading the public Pippingarra Road

Location Pippingarra Road, running south from an intersection with the Great Northern Highway to the east of Port Hedland, Western Australia
Type of Financing Mechanism

Loan

Amount of Financing Mechanism

Up to $19.5m