Investment Decision Notifications
Element 25 Limited
Butcherbird Manganese Project
Investment Decision Date: May 2025
Name of project proponent | Element 25 Limited |
---|---|
Nature of investment/project | Construction of an expanded processing facility at the existing Butcherbird site, increasing manganese concentrate production capacity from 360Ktpa to 1.1Mtpa. |
Location | Pilbara region, 130 kilometres south of Newman, WA. |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $50m |
Forecast Public Benefit | $909.1m in Gross Regional Product (GRP) to the Pilbara region, 149 jobs during construction and 229 jobs during operations over 18 years. |
Indigenous Engagement Strategy | Please refer to the project page by clicking on the link below this table. |
Community Housing Limited (CHL) in collaboration with Tetris Capital Pty Ltd (Tetris)
Cairns Seniors Community Housing Project
Investment Decision Date: August 2024
Name of project proponent | Community Housing Limited (CHL) in collaboration with Tetris Capital Pty Ltd (Tetris) |
---|---|
Nature of investment/project | For the purposes of providing social, affordable and specialist disability accommodation (SDA). |
Location | Cairns, Queensland |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $140m |
Forecast Public Benefit | $140.8m (during construction and over 20 years operational lifetime) and 322 jobs (290 during construction and 32 during operations) |
Indigenous Engagement Strategy | Please refer to the project page by clicking on the link below this table. |
Learn more about the Cairns Seniors Community Housing Project
North Queensland Airports
Airports Upgrade Project
Investment Decision Date: April 2024
Name of project proponent | North Queensland Airports |
---|---|
Nature of investment/project | For the purposes of delivering an upgrade capex program at the Cairns and Mackay Airports (Project). |
Location | Cairns and Mackay, Queensland |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $155m |
Forecast Public Benefit | $1.4b (during construction and 20-year operational lifetime) and 2,002 jobs (505 during construction and 1,497 during operations) |
Indigenous Engagement Strategy | Please refer to the project page by clicking on the link below this table. |
Learn more about the North Queensland Airports Upgrade Project
Alpha HPA Limited
HPA First Project
Investment Decision Date: January 2024
Name of project proponent | Alpha HPA Limited |
---|---|
Nature of investment/project | The Alpha HPA First Project involves the development of a full-scale commercial plant and associated site infrastructure which will produce high-purity alumina (HPA) and related high-purity aluminum products. |
Location | Gladstone, Queensland |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $200m |
Forecast Public Benefit | $437.4m (during construction and 20-year operational lifetime) and 693 jobs (489 during construction and 204 during operations). |
Indigenous Engagement Strategy | Please refer to the project page by clicking on the link below this table. |
Arafura Rare Earths Ltd
Nolans Bore Rare Earths Project
Investment Decision Date: January 2024
Name of project proponent | Arafura Rare Earths Limited |
---|---|
Nature of investment/project | The Nolans Rare Earths Project comprises the development of a rare earths mine and processing facilities (including beneficiation, extraction, and separation plants). |
Location | 135km north of Alice Springs, Northern Territory |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $200m |
Forecast Public Benefit | $1.4b (during construction and 29.25-year operational lifetime) and 334 jobs (during construction and operations). |
Indigenous Engagement Strategy | Please refer to the project page by clicking on the link below this table. |
Heritage Minerals
Mount Morgan Tailings Processing and Rehabilitation Project
Investment Decision Date: December 2022
Name of project proponent | Heritage Minerals |
---|---|
Nature of investment/project | Mount Morgan Gold Mine |
Location | Mount Morgan, Queensland |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $66m |
Forecast Public Benefit | $849m (during construction and over 6-year operational lifetime) and 400 jobs (250 during construction and 150 during operations). |
Learn more about the Mount Morgan Tailings Processing and Rehabilitation Project
Pilbara Minerals Ltd
P680 Expansion Project
Investment Decision Date: September 2022
On 20 September 2022, the NAIF Board made an Investment Decision to offer a Financing Mechanism, being a loan of up to $125 million, to Pilbara Minerals Limited in Western Australia for the purpose of supporting the expansion of operations at its Pilgangoora Operations.
Name of project proponent | Pilbara Minerals Limited |
---|---|
Nature of investment/project | P680 Expansion Project |
Location | Pilbara region, Western Australia |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $125m |
Forecast Public Benefit | $1.4b (during construction and over 18-year operational lifetime) and 675 jobs (355 during construction and 320 during operations). |
Learn more about the Pilbara Minerals P680 Expansion Project
Perdaman Chemical and Fertilisers Pty Ltd
Urea Project
Investment Decision Date: August 2022
Name of project proponent | Perdaman Chemical and Fertilisers Pty Ltd (PCF) |
---|---|
Nature of investment/project | Development of the Perdaman Urea Plant |
Location | Burrup Peninsula, north of Karratha, Western Australia |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $220m |
Forecast Public Benefit | $8.5b (during construction and over 40 years operation lifetime) and 2,490 jobs (during construction and operations). |
Kimberley Mineral Sands Pty Ltd
Thunderbird Minerals Sands Project
Investment Decision Date: March 2022
Name of project proponent | Kimberley Mineral Sands Pty Ltd |
---|---|
Nature of investment/project | Infrastructure related to the development of the Thunderbird Mineral Sands Project which comprises a mine, process plant and non-process infrastructure. |
Location | The Dampier Peninsula, Kimberley region northern WA, between Derby and Broome |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $160m |
Forecast Public Benefit | $1.85b (during construction and over 40-years operational lifetime) and 570 jobs (225 during construction and 345 during operations). |
Water Corporation
Burrup Scheme Upgrade
Investment Decision Date: November 2021
Name of project proponent | Water Corporation |
---|---|
Nature of investment/project | Development of critical infrastructure to support the Perdaman Urea Plant including the expansion of the Burrup seawater supply and brine disposal scheme. |
Location | Pilbara region, Western Australia |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $95m |
Forecast Public Benefit | $8.5b (during construction and over 40 years operation lifetime) and 2,490 jobs (during construction and operations). |
Pilbara Ports Authority
Expansion of Port Dampier
Investment Decision Date: November 2021
Name of project proponent | Pilbara Ports Authority |
---|---|
Nature of investment/project | Development of critical infrastructure to support the Perdaman Urea Plant including a new multi-user bulk export wharf, including berth and landside at the existing Port of Dampier. |
Location | Pilbara region, Western Australia |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $160m |
Forecast Public Benefit | $8.5b (during construction and over 40 years operation lifetime) and 2,490 jobs (during construction and operations). |
Northern Territory Government
Northern Territory Local Jobs Fund
Investment Decision Date: September 2021
Name of project proponent | Northern Territory Government |
---|---|
Nature of investment/project | The project is a proposed financing partnership with the Northern Territory Local Jobs Fund to deliver a growth capex concessional lending program in the Northern Territory. Eligible projects will be across multiple business sectors. |
Location | Northern Territory |
Type of Financing Mechanism | Unsecured limited recourse loan to Northern Territory Local Jobs Fund (through Northern Territory Treasury Corporation) for the purposes of onlending of secured loans. |
Amount of Financing Mechanism | Up to $50m |
Forecast Public Benefit | $110.1m and 532 jobs (during construction and operations). |
ALLIANCE AVIATION SERVICES LTD
Maintenance, Repair and Overhaul (MRO) Facility
Investment Decision Date: August 2021
Name of project proponent | Alliance Aviation Services Ltd |
---|---|
Nature of investment/project | The project will enable Alliance to relocate the heavy base maintenance of its entire aircraft fleet, which since 2015 have been serviced predominantly overseas. The benefits of the Project to Alliance include cost control and operational certainty around its long-term aircraft maintenance plans for its expanding fleet. |
Location | Rockhampton, Queensland |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $30m |
Forecast Public Benefit | $342m (during construction and over 30 years operational lifetime) and 198 jobs (100 during construction and 98 during operations). |
Learn more about the Alliance Airlines Maintenance, Repair and Overhaul (MRO) Facility
Kimberley Cotton Company Ltd
Kimberley Cotton Gin
Investment Decision Date: August 2021
Name of project proponent | Kimberley Cotton Company Ltd |
---|---|
Nature of investment/project | The Kimberley Cotton Gin Facility will comprise a two-stand gin module and ancillary infrastructure. |
Location | Kununurra, Western Australia |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $32m |
Forecast Public Benefit | $248m (during construction and over 30 years operational lifetime) and 61 jobs (30 during construction and 31 during operations). |
Pembroke Resources Pty Ltd
Olive Downs Steelmaking Coal Project
Investment Decision Date: April 2021
Name of project proponent | Pembroke Resources Pty Ltd |
---|---|
Nature of investment/project | Construction of road, water infrastructure, rail, power supply infrastructure and coal handling preparation plant. |
Location | Bowen Basin, Queensland |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $175m |
BCI MINERALS LTD
Mardie Salt and Sulphate of Potash Project
Investment Decision Date: December 2020
Financial assistance to the project is subject to a number of conditions including the finalisation of the Western Australian Government’s consideration and agreement for the approved funds to be advanced.
Name of project proponent | BCI Minerals Ltd |
---|---|
Nature of investment/project | The development of salt and sulphate of potash production facilities, and a port facility. |
Location | Pilbara region, north-west of WA |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $450m On 28 September 2021 the NAIF Board made an Investment Decision to offer an additional Financing Mechanism of $40 million to support the project. Up to $40m |
Humpty Doo Barramundi Pty Ltd
Farm Expansion Project Stage 2
Investment Decision Date: September 2020
Name of project proponent | Humpty Doo Barramundi Pty Ltd |
---|---|
Nature of investment/project | Infrastructure associated with second stage of expansion. |
Location | Humpty Doo, Northern Territory |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $24.2m |
Learn more about the Humpty Doo Barramundi Farm Expansion Project
CQUniversity Australia
Digital Transformation and Supporting Infrastructure
Investment Decision Date: July 2020
Name of project proponent | CQUniversity Australia |
---|---|
Nature of investment/project | Package of capital expenditure programs including digital infrastructure. |
Location | CQUniversity campuses in Queensland |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $76m |
Learn more about the CQU Digital Transformation and Supporting Infrastructure Project
Merricks Capital Pty Ltd
Hudson Creek Power Station and Batchelor Solar Farm
Investment Decision Date: July 2020
Name of project proponent | Merricks Capital Pty Ltd |
---|---|
Nature of investment/project | Construction of a 12MW capacity gas power plant and a 10MW capacity solar farm. |
Location | Darwin and Darwin region, Northern Territory |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $37m |
Learn more about the Hudson Creek Power Station and Batchelor Solar Farm Project
STRANDLINE RESOURCES LTD
Coburn Heavy Mineral Sands Project
Investment Decision Date: June 2020
Name of project proponent | Strandline Resources Limited |
---|---|
Nature of investment/project | Development of the Project to allow for mining operations, beneficiation, minerals separation processing and associated infrastructure to produce 23.4Mtpa of mineral sand products. |
Location | Gascoyne region of WA |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $150 million |
Learn more about the Strandline Resources Coburn Heavy Mineral Sands Project
Charles Darwin University
Education and Community Precinct (Danala) and Casuarina Campus Project
Investment Decision Date: June 2020
Name of project proponent | Charles Darwin University |
---|---|
Nature of investment/project | Construction of a new Education and Community precinct in Darwin city (“CDU City Campus”) and the repurposing of the existing campus at Casuarina. |
Location | Darwin, Northern Territory |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $151.5m |
Learn more about the Education and Community Precinct Project
Mater Health Services North Queensland Limited
Multi-Storey Carpark
Investment Decision Date: March 2020
Name of project proponent | Mater Health Services North Queensland Limited |
---|---|
Nature of investment/project | Construction of a six-level car park facility at the Mater Hospital, Pimlico Campus in Townsville. This car park is a critical part of the hospital’s three stage redevelopment. |
Location | Townsville, Queensland |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $19.75m |
Learn more about the Mater Health Multi-Storey Carpark Project
James Cook University
Student Halls of Residence (Burralga Yumba)
Investment Decision Date: January 2020
Name of project proponent | James Cook University |
---|---|
Nature of investment/project | Construction of a new student accommodation facility. |
Location | James Cook University Townsville Campus, Townsville, Queensland |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $46m |
Learn more about the JCU Student Halls of Residence (Burralga Yumba) Project
Northern Territory Government
Darwin Shiplift Project
Investment Decision Date: November 2019
Name of project proponent | Northern Territory Government |
---|---|
Nature of investment/project | Construction of an open access multi-user ship lift facility and associated marine industry infrastructure. |
Location | East Arm Precinct, Darwin NT |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $300m |
Cowboys Rugby League Football Ltd
Community, Training and High-Performance Centre
Investment Decision Date: November 2019
Name of project proponent | Cowboys Rugby League Football Ltd |
---|---|
Nature of investment/project | Construction of multi-user social infrastructure comprising multi-sport high-performance training spaces, sports medicine and sports science laboratories, community spaces and a full-sized training field, in addition to administrative office space. |
Location | Townsville, Queensland |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $20m |
Learn more about the Cowboys Community, Training and High-Performance Centre
Signature Onfarm Pty Ltd
Beef Processing Facility
Investment Decision Date: August 2019
Name of project proponent | Signature Onfarm Pty Ltd |
---|---|
Nature of investment/project | Construction of an on-farm, greenfield specialist service, beef processing facility with onsite accommodation for up to 70 employees and other ancillary amenities including office, amenities, lairage, waste water treatment, dry store building, irrigation system and supporting water, energy, telecommunications, road and IT infrastructure. |
Location | Clermont, Queensland |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $25m |
Learn more about the Signature Onfarm Beef Processing Facility Project
Genex Power Ltd
Kidston Pumped Storage Hydro Project
Investment Decision Date: July 2019
Name of project proponent | Genex Power Ltd |
---|---|
Nature of investment/project | Construction of a 250MW pumped storage hydro project. |
Location | Kidston, Queensland |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $610m |
Learn more about the Genex Power Kidston Pumped Storage Hydro Project
Alinta Energy Pty Ltd
Chichester Solar / Gas Hybrid Project
Investment Decision Date: February 2019
Name of project proponent | Alinta Energy Pty Ltd |
---|---|
Nature of investment/project | Infrastructure including a 60MW solar PV power station; transmission infrastructure; switchyards; and substations to supply electricity. |
Location | East Pilbara |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $90m |
Northern Territory Airports Pty Ltd
NT Airports Infrastructure and Upgrades
Investment Decision Date: January 2019
Name of project proponent | Northern Territory Airports Pty Ltd |
---|---|
Nature of investment/project | A range of investments as part of an infrastructure expansion package across airport sites in Darwin, Tennant Creek and Alice Springs including:
|
Location | Darwin, Alice Springs and Tennant Creek, Northern Territory |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $150m |
Learn more about the Northern Territory Airports Infrastructure and Upgrades Project
Queensland Airports Ltd
Redevelopment of Townsville Airport
Investment Decision Date: January 2019
Name of project proponent | Queensland Airports Ltd |
---|---|
Nature of investment/project | Redevelopment and expansion of the Townsville Airport Passenger Terminal including substantial refurbishment of the terminal (such as doubling the capacity of the departure lounge, new boarding gates, expanded security areas and the installation of self-check in and bag-drop facilities), better road access and an upgrade to core infrastructure. |
Location | Townsville, Queensland |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $50m |
Learn more about the Queensland Airports Redevelopment of Townsville Airport Project
James Cook University
Technology Innovation Complex
Investment Decision Date: June 2018
Name of project proponent | James Cook University |
---|---|
Nature of investment/project | Building of a Technology Innovation Complex, a 10,000m2 centre for students, industry partners and researchers. |
Location | James Cook University Townsville Campus, Townsville, Queensland |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $96m |
Learn more about the JCU Engineering and Innovation Place Project
Voyages Indigenous Tourism Australia Pty Ltd
Connellan Airport Upgrades and Accommodation
Investment Decision Date: May 2018
Name of project proponent | Voyages Indigenous Tourism Australia Pty Ltd |
---|---|
Nature of investment/project | Airport runway, taxiway and apron upgrade, runway lighting and provision of contractor accommodation. |
Location | Yulara, Northern Territory |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $27.5m |
Learn more about the Voyages Connellan Airport Upgrades and Accommodation Project
Humpty Doo Barramundi Pty Ltd
Farm Expansion Stage 1
Investment Decision Date: May 2018
Humpty Doo Barramundi Pty Ltd
Name of project proponent | Humpty Doo Barramundi Pty Ltd |
---|---|
Nature of investment/project | Development of a solar farm, a medium fish nursery, processing equipment and adult fish feeding systems. |
Location | Humpty Doo, Northern Territory |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $7.18m |
Learn more about the Humpty Doo Barramundi Farm Expansion Project
Onslow Marine Support Base Pty Ltd
Onslow Marine Support Base
Investment Decision Date: September 2017
Name of project proponent | Onslow Marine Support Base Pty Ltd |
---|---|
Nature of investment/project | Development of a marine supply facility including wharf and harbour expansion. |
Location | Beadon Creek Onslow, Western Australia |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $16.8m |
Investment Decisions no longer proceeding with NAIF loan
De Grey Mining Ltd
Hemi Gold Project
Investment Decision Date: July 2024
Name of project proponent | De Grey Mining Ltd |
---|---|
Nature of investment/project | The Hemi Gold Project comprises the development of a conventional open cut gold mine located in the Pilbara region of WA. |
Location | In the Pilbara ~85km south of Port Hedland, Western Australia |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $150m |
Forecast Public Benefit | $6.2b (during construction and over 12 years operational lifetime) and 1,740 jobs (1,240 jobs over 2 years and 500 jobs during operations). |
Indigenous Engagement Strategy | The proponent made commitments in their Indigenous Engagement Strategy in relation to participation, employment and procurement, however this project is no longer proceeding with a NAIF loan. |
Mater Private Hospital Townsville
Maternity and Renal Unit Project
Investment Decision Date: September 2023
Name of project proponent | Mater Private Hospital Townsville (Mater Misericordiae Ltd). |
---|---|
Nature of investment/project | The Project comprises a single level purpose-built maternity suite and the refurbishment of an existing building to house renal services. It also involves transferring the maternity and renal services from Hyde Park to Pimlico campus, thereby providing modern facilities, and growing renal capacity to meet community demand and local population growth. |
Location | Pimlico Campus, Mater Private Hospital Townsville, QLD |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $25m |
Forecast Public Benefit | $46.5m (during construction and over 20 years) and 181 jobs (168 jobs during construction and 13 during operations). |
Indigenous Engagement Strategy | The proponent made commitments in their Indigenous Engagement Strategy in relation to participation, employment and procurement, however this project is no longer proceeding with a NAIF loan. |
Hastings Technology Metals Ltd
Yangibana Rare Earths Project
Investment Decision Date: December 2022
Name of project proponent | Hastings Technology Metals Ltd |
---|---|
Nature of investment/project | Development of the Yangibana Rare Earths project which comprises the mine site located the Gascoyne region of Western Australia and a hydrometallurgical plant located in Onslow, Western Australia. The Project will produce up to 15,000 tonnes of mixed rare earths carbonate (“MREC”) product with primary content being neodymium and praseodymium (used for permanent magnets) over 14.25 years’ mine life. |
Location | Gascoyne Region and Onslow, Western Australia |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $220m |
Forecast Public Benefit | $1.33b (during construction and over 15 years operational lifetime) and 695 jobs (476 jobs during construction and 219 during operations). |
Indigenous Engagement Strategy | The proponent made commitments through their Indigenous Engagement Strategy for participation, procurement, training and education. |
Mackay Land Pty Ltd
Gold Tyne Capital Works
Investment Decision Date: December 2021
Name of project proponent | Mackay Land Pty Ltd |
---|---|
Nature of investment/project | Gold Tyne Capital Works |
Location | Lakeland, Queensland |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $44m |
Forecast Public Benefit | $181 (during construction and over 20 years) and 639 jobs (267 jobs during construction and 372 during operations). |
Hastings Technology Metals Ltd
Yangibana Rare Earths Project
Investment Decision Date: December 2021
Name of project proponent | Hastings Technology Metals Ltd |
---|---|
Nature of investment/project | Development of the Yangibana Rare Earths project which comprises the mine site located the Gascoyne region of Western Australia and a hydrometallurgical plant located in Onslow, Western Australia. The Project will produce up to 15,000 tonnes of mixed rare earths carbonate (“MREC”) product with primary content being neodymium and praseodymium (used for permanent magnets) over 14.25 years’ mine life. |
Location | Gascoyne Region and Onslow, Western Australia |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $140m |
Forecast Public Benefit | $1.33b (during construction and over 15 years operational lifetime) and 695 jobs (476 jobs during construction and 219 during operations). |
Arnhem Land Progress Aboriginal Corporation
Redevelopment of Food Storage and Warehouse Facility
Investment Decision Date: June 2021
Name of project proponent | Arnhem Land Progress Aboriginal Corporation |
---|---|
Nature of investment/project | The redevelopment of an existing food storage and warehouse facility owned by ALPA. The redevelopment involves the construction of a state-of-the-art ammonia-based refrigeration facility and enhancements to the existing ambient warehouse. |
Location | Alice Springs, Northern Territory |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $13.5m |
Australian Potash Ltd
Lake Wells Sulphate of Potash Project
Investment Decision Date: February 2021
Name of project proponent | Australian Potash Ltd |
---|---|
Nature of investment/project | The development of the Lake Wells Sulphate of Potash project. |
Location | Eastern Goldfields region of WA |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $140m |
Neoen SAS
Kaban Green Power Hub
Investment Decision Date: December 2020
Name of project proponent | Neoen SAS |
---|---|
Nature of investment/project | Kaban Green Power Hub |
Location | Kaban, Queensland |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $280m |
Agripower Australia Ltd
Silicon Fertiliser Mining Facilities and Processing Facility
Investment Decision Date: December 2020
Name of project proponent | Agripower Australia Ltd |
---|---|
Nature of investment/project | The development of silicon fertiliser mining facilities and a processing facility in accordance with an approved capital works program. |
Location | Conjuboy and Charters Towers, Queensland |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $71m |
BSE Maritime Solutions
Shiplift Facility
Investment Decision Date: October 2020
Name of project proponent | BSE Maritime Solutions |
---|---|
Nature of investment/project | Development of a Shiplift Facility |
Location | Cairns, Queensland |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $32m |
Anthony Veder Group N.V.
LNG Bunkering Project
Investment Decision Date: July 2020
Name of project proponent | Anthony Veder Group N.V. |
---|---|
Nature of investment/project | LNG Bunkering Project |
Location | Western Australia |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $129m |
Metro Mining Ltd
Bauxite Hills Mine Stage 2 Expansion Project
Investment Decision Date: November 2019
Name of project proponent | Metro Mining Ltd |
---|---|
Nature of investment/project | Construction of an offshore floating terminal, to facilitate the loading of bauxite from barges on to ships for transportation to customers. |
Location | North of Weipa, Queensland |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $47.5m |
Australian Aboriginal Mining Corporation Pty Ltd
Borefield, Crushing Plant and Site Accommodation
Investment Decision Date: August 2019
Name of project proponent | Australian Aboriginal Mining Corporation Pty Ltd |
---|---|
Nature of investment/project | Construction of a borefield, crushing plant and site accommodation and a 55km haul road to connect the Great Northern Highway to the Cloudbreak site. |
Location | 80 kms north west of Newman, Western Australia |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $12.5m |
Kalium Lakes Ltd
Beyondie Sulphate of Potash Project
Investment Decision Date: February 2019
Name of project proponent | Kalium Lakes Ltd |
---|---|
Nature of investment/project | Development of the Beyondie Sulphate of Potash Project involving sulphate of potash (SOP), with initial production of 90ktpa SOP plus supporting infrastructure comprising a 78 kilometre gas pipeline, a gas-fired power station, access road, communication facilities, an airstrip and an accommodation village. |
Location | Southeast of Newman, within the Shires of Wiluna and Meekatharra of Western Australia. |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $74m On 26 August 2021 the NAIF Board made an Investment Decision to offer an additional Financing Mechanism of $10 million to support the Beyondie Sulphate of Potash Project. Up to $10m |
Sheffield Resources Ltd
Thunderbird Minerals Sands Project
Investment Decision Date: August 2018
Name of project proponent | Sheffield Resources Ltd |
---|---|
Nature of investment/project | Construction of infrastructure including LNG power station and reticulation, site accommodation village and processing facility and also upgrading of existing local road and port infrastructure all to support the Thunderbird Mineral Sands Project. |
Location | West Kimberley, between Derby and Broome, Western Australia |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $95m |
Pilbara Minerals Ltd
Pippingarra Road Upgrade
Investment Decision Date: August 2018
Name of project proponent | Pilbara Minerals Ltd |
---|---|
Nature of investment/project | Upgrading the public Pippingarra Road |
Location | Pippingarra Road, running south from an intersection with the Great Northern Highway to the east of Port Hedland, Western Australia |
Type of Financing Mechanism | Loan |
Amount of Financing Mechanism | Up to $19.5m |